Load Bank Testing

Using a Load Bank at the commissioning stage as well as part of preventative maintenance inspections for Generator, UPS and battery systems will help provide confidence in the integrity of the power support infrastructure. Most generator and UPS systems are installed as emergency standby systems and seldom run under load conditions. In the event of a power outage or electrical problem that necessitates use of your backup system you want to be confident that the backup system will operate and run at 100% efficiency. To avoid complete failure of your backup emergency power system, periodic load bank testing at 100% load should be carried out to ensure complete system reliability and peace of mind. Anything less than 100% load testing may not highlight a potential problem that will result in a failure of the backup system when it's needed most.

EPI can provide a comprehensive testing and diagnostic plan designed to ensure your UPS and Generator systems will work at peak efficiency and provide confirmation of system integrity and the ability to effectively support 100% of rated load in Normal Operation. It is beneficial to the business that potential weaknesses are identified under controlled conditions. Load bank testing is an ideal way of discovering whether all the components of the system will work together and performs as intended if called upon to support a critical load.

Technical Features

  • Delivery of portable air-cooled load bank and temporary cables for connection to the supply.
  • Up to Four hour full load test and a series of varying load steps on the Power Generation system
  • Measure and record every 5 minutes for the duration of the test: voltage, Current, kVA, kW, power factor and Frequency.
  • Load Bank Test Service report will be provided to the customer upon completion of service.

Benefits to Customer:

  • Provides tangible proof that the system will support full load in all modes of operation.
  • Assures functionality and reliability of Power Generation system and entire electrical infrastructure including cabling, switchgear and protective devices under full load.
  • Provides assurance that the generator starting battery will perform as specified in case of incoming mains failure.
  • Provides assurance that the UPS will provide battery back up for the period of time the generator takes to start or a controlled shut down of the system.
  • Provides the peace of mind that your system is operational to manufacturers specifications.
  • Load bank testing can also be used for battery autonomy testing.


To find out more, please call one of our consultants on 01993 708855 or
email sales@epi-uk.com

Services Enquiry

Footer Menu

© EPI Service 2009
Website by: SpringDigital

Products | Solutions | Services | Case Studies | News | Downloads | Contact

Footer Address

Witan Park, Avenue 2, Station Lane, Witney, Oxfordshire, UK OX28 4FH | Tel: +44 (0) 1993 708855 | Fax: +44 (0) 1993 708850 | Email: sales@epi-uk.com
Registered in England Company Registration Number 2823831, VAT Registration No GB 663 4737 15